The dataset comprised of epic agile requirements which needs to be decomposed.Subsequent to their decomposition, the system initiate task assignment algorithm.The algorithm accepts square matrix as an input. The model (Hungerian algorithm output proposed task assigments. Each developer is assigned tasks in the form sprint planning